Simulation of Mantuil 09 Bridge Construction Scheduling Due to Delays Using Microsoft Project
DOI:
https://doi.org/10.55927/mudima.v5i8.531Keywords:
Project Scheduling, Microsoft Project, Project DelaysAbstract
The construction of the Mantuil 09 Bridge in Banjarmasin is a complex project that requires precise time planning to avoid delays. This study uses Microsoft Project to develop the schedule, identify the critical path, and simulate solutions for delays caused by the late delivery of Grade 345 structural steel materials. The results show that the initial project duration was 215 calendar days with 27 critical activities. After simulating the delay, the project duration increased to 221 days, and the number of critical activities decreased to 21. Solutions such as overtime and changes to working hours successfully returned the project duration to 215 days, in line with the original schedule.
References
Arianie, G. P., & Puspitasari N. B. (2017). MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER DAYA PERUSAHAAN ( Studi Kasus : Qiscus Pte Ltd ). Jurnal Teknik Industri 12(3), 189-196.
https://garuda.kemdikbud.go.id/documents/detail/4281865
Dirawan, G. D., Risqiayah, U. H., U., Nurfadhila, U., Aprianty, W., & Ramadhani, N. F. (2024). Critical Path Identification and Time Estimation in Construction : Application of PDM and PERT [Identifikasi Jalur Kritis Dan Estimasi Waktu Dalam Konstruksi : Penerapan PDM Dan PERT]. Jurnal Sipakatau, 2 (December), 253–61.
https://garuda.kemdikbud.go.id/documents/detail/4564122
Hia, R. A. P., & Nusa, A. B. (2024). Analisis Penjadwalan Proyek Dengan Metode Cpm Dan Pdm Menggunakan Aplikasi Microsoft Project 2019 Pada Proyek Pembangunan Gedung Puskesmas Susua Kabupaten Nias Selatan. Jurnal Teknik Sipil, 3 (1), 9–15. https://doi.org/10.30743/jtsip.v3i1.9545.
Ifaziah, N. (2024). Perencanaan penjadwalan dengan menggunakan metode PDM (Precedence Diagram Method) menggunakan aplikasi MS Project: Proyek penanganan ruas jalan P.K Hilir - Sungai Bahalang Kabupaten Tapin [Skripsi Sarjana Terapan, Politeknik Negeri Banjarmasin].
https://garuda.kemdikbud.go.id/documents/detail/4351802
Khaidir, I., Ayu, E. S., & Andriani, M. D. P. (2022). Implementasi Metode Precedence Diagram Method (PDM) dalam pengendalian proyek konstruks. Jurnal Rekayasa, 12 (2), 175–82. https://doi.org/10.37037/jrftsp.v12i2.136.
Lengkong, S. (2023). Analisis Penjadwalan Proyek Menggunakan Metode PDM Dengan Menggunakan Konsep Cadangan Waktu Pada Proyek Pembangunan Balai Kesehatan Ibu Dan Anak Kota Manado. Tekno, 21 (84).
https://garuda.kemdikbud.go.id/documents/detail/3777311
Luntungan, C., Arsjad, T. T., & Mangare, J. B. (2023). Analisis penjadwalan proyek dengan menggunakan Predence Diagram Method. Tekno, 21(85).
https://ejournal.unsrat.ac.id/v3/index.php/tekno/article/view/50806
Panjaitan, S. A. (2023). Analisis penjadwalan proyek dengan Microsoft Project 2019 pada proyek pembangunan gedung parkir PTPN 1V (studi kasus) [Skripsi Sarjana, Universitas Muhammadiyah Sumatera Utara].
https://repository.umsu.ac.id/handle/123456789/21054
Rani, H. A. (2016). Manajemen Proyek Konstruksi (hlm.99). https://www.researchgate.net/publication/316081639_Manajemen_Proyek_ Konstruksi
Soeharto, l. (2022). Manajemen proyek (Jilid 2, No. 12), 365–77.
https://sostech.greenvest.co.id/index.php/sostech/article/view/517
Sorongan, V. M., Dundu, A. K. T., & Tjakra, J. (2022). Analisa Penjadwalan Proyek Menggunakan Metode PDM Dengan Menggunakan Konsep Cadangan Waktu Pada Proyek Peningkatan Ruas Jalan Tondano-Kembes-Manado Seksi 2. Tekno, 20 (81), 399–408.
https://ejournal.unsrat.ac.id/v3/index.php/tekno/article/view/42761
Tamalika, T., Azhari, A., Fuad, l. S., Azrin, a., & Ardaisy, M. (2025). Aplikasi penjadwalan proyek dengan PDM (precedence Diagram Method) pada pekerjaan konstruksi di CV. Wahyu Jaya Persada Konsultan Palembang. Bersama: Jurnal Pengabdian Masyarakat, 3(1), 66-76.
https://doi.org/10.61994/bersama.v3i1.1053
Tombokan, B. F., Malingkas, G. Y., & Pratasis, P. A. K. (2022). Analisis Hubungan Pekerjaan Dan Lintasan Kritis Pada Penjadwalan Proyek Pembangunan Rumah Sakit Umum Daerah Dr . Sam Ratulangi Tondano. Jurnal Teknik Sipil, 20.
https://ejournal.unsrat.ac.id/v3/index.php/tekno/article/view/45016
Wulan, P., Anjarwati, S., & Suksmono, A. K. (2025). Analisis Penjadwalan Proyek Konstruksi Dengan Metode Precedence Diagram Method ( Studi Kasus : Proyek Pembangunan Mitra 10 Purwokerto ) [Analysis of Construction Project Scheduling Using the Precedence Diagram Method ( a Case Study : Mitra 10 Purwokerto)] Jurnal Teknik Sipil, 6 (1).
https://jurnalnasional.ump.ac.id/index.php/CIVENG/article/view/23560
Published
Issue
Section
License
Copyright (c) 2025 Anisah Fakhriani, Muhammad Humaidi

This work is licensed under a Creative Commons Attribution 4.0 International License.